Complete Guide to KL Public Transport (LRT, MRT, Bus & Grab) - 2025 Updated

Master KL public transport with our comprehensive guide. LRT, MRT, bus routes, Grab tips, Touch n Go payments & insider travel hacks for 2025.

Expert Content Analysis
Malaysian Relevance
Complexity Level
Intermediate
Read Time
4 min
Select Your Language | Pilih Bahasa Anda

Choose your preferred language for better understanding

Showing content in Bahasa Melayu
Tip: Press Alt + L to quickly switch languages

Complete Guide to KL Public Transport - Your Essential 2025 Manual

Overview of KL Public Transport System

The Big Picture

**LRT (Light Rail Transit):** 3 lines covering major urban areas
**MRT (Mass Rapid Transit):** 2 modern lines with more under construction
**Monorail:** Connecting city center to key districts
**KTM Komuter:** Suburban railway system
**RapidKL Buses:** Extensive bus network
**BRT (Bus Rapid Transit):** Dedicated bus lanes in Sunway area
**Ride-hailing:** Grab, MyCar, and other app-based services

LRT (Light Rail Transit) System

Kelana Jaya Line (LRT1)

**Route: ** Gombak ↔ Putra Heights
**Operating Hours: ** 6:00 AM - 11:30 PM (12:30 AM weekends)
**KL Sentral** - Main transport hub
**Masjid Jamek** - Historic city center
**KLCC** - Petronas Twin Towers area
**Ampang Park** - Shopping district
**Wangsa Maju** - Residential area
**Travel Time: ** Gombak to Putra Heights = 55 minutes
**Frequency: ** Every 3-5 minutes during peak hours

Ampang/Sri Petaling Line (LRT2)

**Route: ** Ampang/Sentul Timur ↔ Putra Heights
**Operating Hours: ** 6:00 AM - 11:30 PM
**Masjid Jamek** - Interchange with Kelana Jaya Line
**Plaza Rakyat** - Central Market area
**Hang Tuah** - Monorail interchange
**Chan Sow Lin** - Cheras connection
**Kinrara** - Puchong area

LRT3 (Under Construction - 2025 Update)

**Expected Completion: ** Phase 1 completed in 2024
**Route: ** Bandar Utama ↔ Klang
**Status: ** Operational since September 2024

MRT (Mass Rapid Transit) System

Kajang Line (MRT1)

**Route: ** Kwasa Damansara ↔ Kajang
**Operating Hours: ** 6:00 AM - 12:00 AM
Fully air-conditioned trains
Platform screen doors for safety
WiFi available in all stations
**Important Stations: **
**KL Sentral** - Major interchange
**Bukit Jalil** - Sports and residential hub
**Serdang** - University area (UPM)
**Kajang** - Southern terminus

Putrajaya Line (MRT2)

**Route: ** Kwasa Damansara ↔ Putrajaya
**Operating Hours: ** 6:00 AM - 12:00 AM
**KL Sentral** - Transport hub
**Maluri** - Eastern KL
**Seri Kembangan** - Residential area
**Putrajaya Sentral** - Government administrative center

Payment Methods & Fares

Touch n Go Card

**The Universal Solution: **
Works on ALL public transport in KL
Available at any station or 7-Eleven
Minimum top-up: RM 10
Card cost: RM 10 (one-time)

Digital Payment Options (2025 Update):

**Touch n Go eWallet** - Scan QR codes
**Boost** - Accepted on most services
**GrabPay** - For Grab rides only
**Bank cards** - Limited acceptance

Fare Structure (2025 Updated Prices)

LRT/MRT Fares:

**Minimum fare:** RM 1.40
**Maximum fare:** RM 4.70
**Average city journey:** RM 2.50-3.50

Grab & Ride-Hailing Services

**Typical Fares (2025): **
**KLCC to KL Sentral:** RM 8-12
**KL Sentral to Mid Valley:** RM 6-10
**Airport to city center:** RM 35-55

Essential Apps for Navigation

MyRapid (Official App)

**Features: **
Real-time train/bus arrival times
Route planning
Service announcements
Fare calculator

Tips for Efficient Travel

Peak Hours to Avoid:

**Morning:** 7:30-9:30 AM
**Evening:** 5:30-7:30 PM
**Friday evenings:** Extended until 8:30 PM

Money-Saving Tips:

Conclusion

**Last Updated: ** October 2025 | **Next Review:** January 2026

Complete Guide to KL Public Transport - Your Essential 2025 Manual

Navigating Kuala Lumpur's public transportation system can seem daunting for newcomers, but with this comprehensive guide, you'll master the city's transport networks like a local. From the efficient LRT and MRT systems to buses and ride-hailing apps, we'll cover everything you need to know to travel around KL smoothly and affordably.

Overview of KL Public Transport System

The Big Picture

Kuala Lumpur boasts one of Southeast Asia's most comprehensive urban transport networks, serving over 7 million people in the Greater KL area. The integrated system includes:

**LRT (Light Rail Transit):** 3 lines covering major urban areas
**MRT (Mass Rapid Transit):** 2 modern lines with more under construction
**Monorail:** Connecting city center to key districts
**KTM Komuter:** Suburban railway system
**RapidKL Buses:** Extensive bus network
**BRT (Bus Rapid Transit):** Dedicated bus lanes in Sunway area
**Ride-hailing:** Grab, MyCar, and other app-based services

LRT (Light Rail Transit) System

Kelana Jaya Line (LRT1)

**Route: ** Gombak ↔ Putra Heights
*Key Stations: *
**KL Sentral** - Main transport hub
**Masjid Jamek** - Historic city center
**KLCC** - Petronas Twin Towers area
**Ampang Park** - Shopping district
**Wangsa Maju** - Residential area
**Travel Time: ** Gombak to Putra Heights = 55 minutes
**Frequency: ** Every 3-5 minutes during peak hours

Ampang/Sri Petaling Line (LRT2)

**Route: ** Ampang/Sentul Timur ↔ Putra Heights
*Key Stations: *
**Masjid Jamek** - Interchange with Kelana Jaya Line
**Plaza Rakyat** - Central Market area
**Hang Tuah** - Monorail interchange
**Chan Sow Lin** - Cheras connection
**Kinrara** - Puchong area

LRT3 (Under Construction - 2025 Update)

**Expected Completion: ** Phase 1 completed in 2024
**Route: ** Bandar Utama ↔ Klang
**Status: ** Operational since September 2024

MRT (Mass Rapid Transit) System

Kajang Line (MRT1)

**Route: ** Kwasa Damansara ↔ Kajang
*Key Features: *
Fully air-conditioned trains
Platform screen doors for safety
WiFi available in all stations
**Important Stations: **
**KL Sentral** - Major interchange
**Bukit Jalil** - Sports and residential hub
**Serdang** - University area (UPM)
**Kajang** - Southern terminus

Putrajaya Line (MRT2)

**Route: ** Kwasa Damansara ↔ Putrajaya
*Key Stations: *
**KL Sentral** - Transport hub
**Maluri** - Eastern KL
**Seri Kembangan** - Residential area
**Putrajaya Sentral** - Government administrative center

Payment Methods & Fares

Touch n Go Card

**The Universal Solution: **
Works on ALL public transport in KL
Available at any station or 7-Eleven
Minimum top-up: RM 10
Card cost: RM 10 (one-time)

Digital Payment Options (2025 Update):

**Touch n Go eWallet** - Scan QR codes
**Boost** - Accepted on most services
**GrabPay** - For Grab rides only
**Bank cards** - Limited acceptance

Fare Structure (2025 Updated Prices)

LRT/MRT Fares:

**Minimum fare:** RM 1.40
**Maximum fare:** RM 4.70
**Average city journey:** RM 2.50-3.50

Grab & Ride-Hailing Services

**Typical Fares (2025): **
**KLCC to KL Sentral:** RM 8-12
**KL Sentral to Mid Valley:** RM 6-10
**Airport to city center:** RM 35-55

Essential Apps for Navigation

MyRapid (Official App)

**Features: **
Real-time train/bus arrival times
Route planning
Service announcements
Fare calculator

Tips for Efficient Travel

Peak Hours to Avoid:

**Morning:** 7:30-9:30 AM
**Evening:** 5:30-7:30 PM
**Friday evenings:** Extended until 8:30 PM

Money-Saving Tips:

Conclusion

**Last Updated: ** October 2025 | **Next Review:** January 2026